First Phase: Metal Framing
Our expert framers are trained to carry out the construction of metal structures in high gauge from 20 gauge to 16 gauge allowing the framing work to finish with exact levels using appropriate equipment and technology.
Partitions, hard ceiling, modern designs or geometrical figures of any type in ceiling and walls, etc.
Second Phase: Gypsum board/Drywall panel Installation
The installation of drywall panels made by our specialists using a unique technique to achieve maximum material savings and optimal installation on walls, ceilings, or its design fabrics previously worked by our framers. Using appropriate screws for each type of material according to the construction codes of the State of Florida.
Third Phase: Plaster Finish
The quality and experience of our finishers have stood out in each of our completed projects in South Florida. Our General Contractors, developers, and homeowners all have been highly satisfied with the levels of finishes that we provide. We provide level # 4, level # 5, skim coat, and other types of finishes you may need. The high quality finish facilitates the painting work in the next stage.
Copyright © 2018 AVJ DRYWALL AND MARBLE DESIGN CORP - All Rights Reserved.
Powered by GoDaddy Website Builder